2011 and 2010

2010 and 2011 Selected Projects (227 kB pdf)

2010 and 2011 Project Selection Letter from GYCC Chair, January 29, 2010

2011 GYCC Project Reports

Project Type Project Name Location
Air Quality Air Pollution Critical Load Development and Coordination (294 kB pdf) GYA
Climate Change Climate Change and Watershed Sensitivity Analysis (16.6 MB pdf) Gallatin NF
Connect People to Land Bear Creek Natural Resources Field Camp Beaverhead-Deerlodge NF
 Fisheries GYA-Wide Native Fish Distribution/Status Surveys and Response Actions GYA
Invasive Species GYA Aquatic Invasive Species Prevention/Outreach Activities and Inventory/Monitoring (249 kB pdf) GYA
“Holding the Line” Leafy Spurge Control (76 kB pdf)
2011 HTL Report (2.1 MB pdf)
GYA Wide Weed Mapping Support (61 kB pdf)
GYA
Landscape Integrity Reeb Estate Acquisition (177 kB pdf)
Vicinity Map (386 kB pdf)
Cooke City, MT area
Gallatin and Custer NFs
Sustainable Operations Water Conservation through Conversion to Low-Flow Fixtures (284 kB pdf) Yellowstone NP
Historic Buildings Energy and Water Consumption Assessments:
Wapati Ranger Station Shoshone NF (1.2 MB pdf)
Lamar Buffalo Ranch Yellowstone NP (2.2 MB pdf)
Shoshone NF
Yellowstone NP
GYA Xeriscaping Guide (295 kB pdf)
Whitebark Pine Whitebark Pine Seed Orchard Establishment (298 kB pdf) GYA
Sow Whitebark Pine Seedlings in Nursery for GYA Planting (334 kB pdf) GYA
Wildlife Pika Occupancy and Distribution (543 kB pdf) GYA
GYA Wolverine Program/Winter Use Monitoring (289 kB pdf)
WCS Report (2.6 MB pdf)
GYA